DSR 2016 rates are in now, along with DSR 2023.See the books

Upload Schedule get Bill

Enter your measurements. Rates come from the DSR. The bill prints the way your department wants it.

DSR 2023 and DSR 2016. 10,290 items. Every item shows its page number

RA Bill, Schedule of WorkSample quantities
DSR 2023
CodeDescriptionQtyUnitRateAmount
2.8.1Earth work in excavation by mechanical means, foundation trenches, all kinds of soilDSR 2023, Vol 1, page 183142.50cum260.3037,092.75
4.1.3Cement concrete 1:2:4, all work up to plinth levelDSR 2023, Vol 1, page 20118.75cum7,878.501,47,721.88
16.1Preparation and consolidation of sub grade with power road rollerDSR 2023, Vol 2, page 63320.00sqm218.9070,048.00
Say2,54,863

Every rate shows its page.

The rate on your bill is the rate in the book. Every line carries its page number, so you can check it against your own copy of the DSR.

10,290 items from DSR 2023 and DSR 2016, including the 581 cement figures in the Vol 2 appendix that most bills leave out.

  • S.No and item codes stay exactly as your BOQ has them.
  • Quantities are not rounded, so your totals match to the rupee.
  • A bill you signed last year opens with the same rates.

The books we have.

Delhi first using CPWD DSR. More states are coming soon.

DSR 2023CPWD Delhi
5,465items
581cement figures

The current book. Schedule, Abstract and Cement Statement all come out.

DSR 2016CPWD Delhi
4,825items
Nonecement figures

For older works still billed on this book. The cement figures are not in yet, so that statement has to be made by hand.

How it works.

Send the papers you already have. You check the lines, not type them.

  1. 1

    Send the Schedule of Work

    A photo of the paper is enough. Send the award letter with it and your bill gets your details printed on it.

  2. 2

    Our AI reads and matches

    Every item code is matched to the DSR as mentioned in your schedule. The rate comes from the DSR book, never from the photo. Anything it cannot match is marked for you to cross verify.

  3. 3

    Verify and get the bill

    Confirm the lines. Schedule of Work, Measurement, Abstract and Cement Statement come out together, in Excel in your department format.

You make it, we read the papers.

Nobody wants to type a Schedule of Work twice. Hand over the papers you already have and Revenin reads them into the bill.

You make itCreate it yourself using our AI

Upload your Schedule of Work and Award Letter, our AI agent will analyse and checks description, rate and quantities and cross verify with our database.

  • The work stays yours. It sits in your account, not ours.
  • Rates always come from the rate book, never from the reading.
  • Nothing changes on your tender until you press Apply.
Your consultant makes it

If a billing consultant makes your bills.

Many contractors give the bill work to an outside person. That person can make the bill in Revenin, and the bill stays with you.

Making bills for more than one contractor? Write to hello@revenin.in and we will set it up.

  • Every contractor has a separate account. Your bills stay in yours.
  • The consultant prepares the bill. You check it and you sign it.
  • Same DSR rates and the same Excel your department asks for.
  • You can end it any time. The bills stay in your account.

Create your next RA Bill through Revenin.

Start with the DSR you already use for bills. Bring the schedule and get the bill ready in just few steps.