Source pages

Every rate from the book shows its page.

The rate on your bill is the rate in the book, and every line from the book carries the page it was read from. You can check any of it against your own copy of the DSR without asking us anything.

Not most of them. All of them.

A page number on some rows and not others would be worse than none, because the AE would have to work out which rows he can check. So the count is the whole count.

10,532 items from the book, and every one carries the page it was read from. The 123 items CPWD added later in its correction slips have no page in the book.

DSR 2023pages 11 to 405
5,670 of 5,670and 123 added later by CPWD's correction slips
DSR 2016pages 4 to 233
4,862 of 4,862

What it looks like on the bill.

The page number sits under the description, on the line itself, where the AE is already reading.

2.8.1Earth work in excavation by mechanical means, foundation trenches, all kinds of soil260.30 per cumDSR 2023, Vol 1, page 183
4.1.3Cement concrete 1:2:4, all work up to plinth level7,878.50 per cumDSR 2023, Vol 1, page 201
16.1Preparation and consolidation of sub grade with power road roller218.90 per sqmDSR 2023, Vol 2, page 63

Open the book at that page and the rate is there. That is the whole idea, and it is why a returned bill is usually settled in one conversation instead of three.

What that buys you.

  • S.No and item codes stay exactly as your BOQ has them.
  • Quantities are not rounded, so your totals match to the rupee.
  • A bill you signed last year opens with the same rates.

Create your next RA Bill through ContractBill.

Start with the DSR you already use for bills. Bring the schedule and get the bill ready in just few steps.