The 10 sheets in the bill

The bill excel is a small book of sheets, in the order the department reads them, and the sheets are joined by formulas. Change a measurement in RE and the Abstract, the Deviation, the Cement and the Recovery follow, so the whole book stays in step.

Checked against ContractBill on 12 October 2026

Every sheet starts with the same header, the name of work, the agency and the agreement number, taken from your tender details. Tender details and the award letter

The sheets, in order

SheetWhat it is for
ScheduleYour Schedule of Work with the rates, the quantities and the amounts, and the chain down to the Work Outlay. Every other sheet takes its description, unit and rate from here.
REYour measurements, item by item, with the quantity worked out for each row. You write it on the Measurements tab. Write measurements
AbstractThe measured bill. Each item is its measured quantity times its rate, and the sheet runs down to the Gross Amount Payable and the Net Payable, with the certified lines the officers sign. The Abstract
CementCement for each item, in quintals, tonnes and bags of 50 kg. This sheet is there only when something is on it. The Cement statement
DeviationWhat was sanctioned against what was done, item by item. The Deviation statement
RecoveryThe security deposit, income tax, GST TDS and labour cess that the department keeps back, and what is left to pay. Recovery and Net payable
AE TestThe AE's Test Check Statement, a ruled form for the AE to fill in and sign.
EE TestThe EE's Test Check Statement, the same form for the EE.
Part RateItems that are built but not finished, paid at a part rate now with the balance held back. This sheet is there only when an item has a part rate.
Completion CertificateThe paragraph that says the work is physically complete, with a place for the EE, the AE and the JE to sign.
The Sheets list of the PDF panel on the Download page, from Schedule to Completion Certificate, in the same order as the tabs of the bill excel
The Sheets list on the Download page of a sample tender. The bill excel has the same sheets in the same order, and this bill has no part rate, so it has 9 sheets.

Things to know

  • A full bill has 10 sheets. Cement and Part Rate are left out when they would be empty, so a smaller bill has fewer.
  • The Part Rate sheet comes from the Part rate tab on the Bill page. Type a part rate only on items that are built but not finished, and the bill still pays them at the full rate.
  • The AE Test, EE Test and Completion Certificate are forms. The header and the printed words are filled in for you, and the rest is left for the officers, so print them and get them signed.
  • The date on the Completion Certificate comes from the date the work finished in your tender details. If you did not type it, the certificate leaves a blank for it, and it never puts in today's date for you.
  • The formulas are live, so a figure you change in the excel moves everything after it. The same sheets can be printed as PDF. Print the bill as PDF